Platform & API Engineering
Backends that survive contact with real traffic. APIs, services, queues, and the boring reliability work most teams skip.

Platform and API engineering, data and AI infrastructure, and rescue work on systems nobody wants to touch. Written scope, fixed price, and the reliability work included rather than deferred to a phase two that never comes.
We are not a general agency. We take on work where the hard part is engineering, and we decline the rest rather than learn on your budget.
Backends that survive contact with real traffic. APIs, services, queues, and the boring reliability work most teams skip.
Pipelines, retrieval systems, and model integration built to be measured — with evals and cost ceilings from day one.
Inherited a codebase nobody understands? We map it, stabilise it, and give you a sequenced plan instead of a rewrite pitch.
Most studios say "we care about quality". Here is what that actually means in practice, stated specifically enough that you can hold us to it.
Whether it is a five-week rescue or a twelve-month platform build, the sequence does not change.
Before estimating anything we read the code, the data model, and the incident history. You get a written map of the system and an honest list of what worries us. If the honest answer is that you do not need us, that is what the document says.
A scope document listing every service, endpoint, and migration in the engagement — and explicitly what is out. Architecture decisions are recorded with their trade-offs. The price attached to that document is the price you pay.
Two-week cycles, every one ending in a deployed environment you can hit. You have commit access, board access, and a channel with the engineers. No status theatre, no progress percentages invented on a Friday.
Load tests against the numbers in your scope document. A security pass. Failure injection on the paths that matter. Runbooks written for the failures we consider most likely. Launch is a scheduled, rehearsed event.
Your repos, your cloud accounts, your documentation. A recorded walkthrough for whoever inherits it. Our access is revoked at handover unless you retain us. Leaving should be easy — that is what makes staying a choice.
Published starting numbers. The scope document confirms the final figure before any work begins — and before you owe anything.
An independent read on a codebase, architecture, or vendor proposal.
5 business days · fixed fee · fully credited against a later build
A scoped system delivered end to end, with the reliability work included rather than deferred.
Typically 6 – 16 weeks · 40 / 30 / 30 milestone billing
Senior engineers inside your team, on your board, in your standups.
Minimum 3 months · 30 days' notice to cancel
Not sure where you land? run the estimator — it returns a real range in about a minute.
Because we never quote before the mapping phase. Reading the system first is what converts unknowns into line items. The scope document lists every service and migration we are building, and equally what we are not.
When something genuinely unforeseeable appears — an undocumented dependency, a vendor API that behaves differently than its docs — we price it as a change order and you decide. We do not absorb it silently and we do not surprise you with it later.
You do, in full, on final payment. That includes source, infrastructure definitions, and documentation, and it is written into our Terms of Service rather than promised verbally.
We retain only our own pre-existing internal tooling, and you get a perpetual royalty-free licence to keep using it inside your product.
Yes, and we prefer to. The best stack is usually the one your team can already maintain. We will flag a technology choice that we think is a genuine liability, with reasoning, but it stays your call.
The exception is where a choice makes the agreed reliability targets unreachable. In that case we say so in the scope document before you sign it, not after.
Then it says that. Roughly one audit in six concludes that an off-the-shelf product, a configuration change, or simply doing nothing beats a custom build.
You keep the report either way, and the audit fee is credited against a build only if you decide to proceed. We would rather lose the project than take budget for work that should not happen.
It is a calibrated range built from our actual delivery data, not a lead-capture toy. For a well-defined project the final scoped price usually lands inside it.
It is still an estimate produced without seeing your system. The mapping phase is what turns it into a fixed number, and that number can move in either direction.
With an incident retainer, yes — an agreed response window, a rotation, and escalation paths documented before anything goes wrong.
Without one we are not in your on-call path, but every build ships with runbooks so your team is not debugging blind.

Send us the shape of the problem. You get a written map, a fixed price, and an honest answer about whether it should be built at all — usually within two business days, at no cost.